A Inclining experiment to be held a Class approved stability booklet is a
shipyard responsibility witch will be provided along with "as build
drawings".
B Water or Cargo dumping test and tests for opening and closing times will
be carried out.
C Anchoring tests.
D Equipment tests.
E Ssiling test for 6 hours approx.
All tests to be done at the risk and expense of bidder. Presence of the owner's
representatives is a must.
The name above test will be repeated at the delivery Port in Karachi ti ensure that
e.g.no damage has occured during he sailing trip to the delivery Port .A docking
at Karachi to replace anodes and executes fresh paint has been anticipates or the
bidder would pay to KPT charges for 2 days docking at the then rates.
Delivery Karachi
All cost of test and trial i.e. confirmatory tests for delivery at Karachi will be at
builder's account.Allduse,taxes,harbour dues,import costs,ect.of whatever
natures in Pakistan are for the client's account.Similar charges for the tug(s)
towing the barges will not be for the client's account.
Confirmatory trials after arrival in delivery Port at Karachi.
In accordance with the test and trial booklet and preliminary tests at
builder's yard.
As soon as the vessel has arrived inKarachi and made ready for services,
the vessel will undergo trials to ensure that the vessel has suffered no
damage to the equivalent,performance or developed any faults during
tranceport.
The engineers will be present in Karachi for 3 months for four barges to
assist,and train the crew on the aperation and maintenance of all the
technical installation.Sailing to be done by KPT crews.