第1个回答 2009-11-23
Luan River Power Plant 2 × 300MW units for new units, condensing water, 100% through the fine processing, fine processing of renewable way for tower law, ammoniation runs. Was found in the debugging process resin separation columns Yang Chuan-yang resin mixed with more resin anion resin, resulting in poor regeneration of mixed beds, water quality below standards, can not be achieved ammoniation to run. This paper discusses in depth when the mixture of lipid Yin Chuan-yang phenomenon of the formation of fat causes, possible solutions were compared, and selected the optimal solution. The program went through in the Luan River Power Plant refined processing applications, good results for the fine treatment as well as the safe operation of power plants has laid a good foundation.
Term control
Condensate Polishing condensate polishing
Resin resin
Conveyor transfer
Ammoniated ammoniated operation run
Thermal power plant thermal power plant
Anion resin anion resins
Yang resin cation resins
Tower France high-tower separation technique
Resin separation tower spt
Mixed-bed mixed resin bed
Regeneration regeneration
Water quality water quality
Two
5.17 The closure of the furnace demands tight boiler insulation end, Slag seal can be put into all the smoke wind baffle can be closed to observe the hole, man hole, flue duct, Slag and other parts of the water seal during the chemical cleaning must have closed condition, reduce heat loss, so as not to reduce the heating rate to affect the quality of chemical cleaning, temporary cleaning pipes and steam pipes in need of insulation work.
5.18 Boiler basically have the ignition conditions to ensure that the boiler chemical cleaning to fire within 20 days after the blowpipe.
6 chemical cleaning of the provisional system installation and implementation of interim measures
6.1 drum at the top of the exhaust pipe to be all the way up towards the end of the air, the exhaust pipe total effective flow area not less than φ100.
6.2 Drum inside the cyclone in pickling should be removed or not installed before, and process until the chemical cleaning and then back loaded.
Term control
Smoke wind baffle air & flue gas damper
Slag seal water seal of slag scraper machine
Exhaust exit pipe
Hearth furnace
Insulation thermal insulation
Look at the fire-hole observation hole
Manhole man hole
Chemical cleaning chemical cleaning
Blowpipe flushing
Drum STEAM DRUM
Cyclone cyclone separator
Boiler boilers
Boiler boiler proper
Air duct air duct
Flue gas pass
希望能帮助你
第2个回答 2009-11-24
可以告诉你的是全部都是用机器翻译的%!!
参考资料:好
第3个回答 2009-11-23
意思
Luan River Power Plant 2 × 300MW units for new units, condensing water, 100% through the fine processing, fine processing of renewable way for tower law, ammoniation runs. Was found in the debugging process resin separation columns Yang Chuan-yang resin mixed with more resin anion resin, resulting in poor regeneration of mixed beds, water quality below standards, can not be achieved ammoniation to run. This paper discusses in depth when the mixture of lipid Yin Chuan-yang phenomenon of the formation of fat causes, possible solutions were compared, and selected the optimal solution. The program went through in the Luan River Power Plant refined processing applications, good results for the fine treatment as well as the safe operation of power plants has laid a good foundation.
Two
5.17 The closure of the furnace demands tight boiler insulation end, Slag seal can be put into all the smoke wind baffle can be closed to observe the hole, man hole, flue duct, Slag and other parts of the water seal during the chemical cleaning must have closed condition, reduce heat loss, so as not to reduce the heating rate to affect the quality of chemical cleaning, temporary cleaning pipes and steam pipes in need of insulation work.
5.18 Boiler basically have the ignition conditions to ensure that the boiler chemical cleaning to fire within 20 days after the blowpipe.
6 chemical cleaning of the provisional system installation and implementation of interim measures
6.1 drum at the top of the exhaust pipe to be all the way up towards the end of the air, the exhaust pipe total effective flow area not less than φ100.
6.2 Drum inside the cyclone in pickling should be removed or not installed before, and process until the chemical cleaning and then back loaded.
第4个回答 2009-11-23
凝结水精处理 condensate polishing
树脂 resin
输送 transfer
氨化运行 ammoniated operation
火电厂 thermal power plant
阴树脂 anion resins
阳树脂 cation resins
高塔法 high-tower separation technique
树脂分离塔 spt
混床 mixed resin bed
再生 regeneration
水质 water quality