英语高手帮忙翻译(除快译、在线翻译)

请翻译下~谢谢了~
本文以发电厂、变电所电气主接线为研究对象,并分别采用逻辑表格法、解析法和时序模拟法对其可靠性进行分析。
本文首先介绍了构成电气主接线各元件的可靠性指标及元件故障状态,并说明可靠性分析的计算步骤,由于主接线系统的特殊性,对其可靠性分析作出了必要假设,给出了解决此类问题的一般步骤;其次,介绍了电气主接线可靠性评估的数学模型;再阐述逻辑表格法、解析法和时序模拟法分析电气主接线可靠性的详细步骤,并将其应用在主接线可靠性评估中。最后,举了两个实例对电气主接线进行可靠性分析计算。
通过本文,我们能对发电厂和变电所主接线的可靠性分析有基本的了解,比较这三种可靠性分析方法,我们发现它们都有其各自的特点和适用范围,在其范围内它们都能求得较准确的结果。

In this paper, power plants, electrical substation main connection to research and were used form of logic, analytical method and timing simulation analysis of its reliability.
This paper first introduced a main electric wiring components of the index and the reliability of components fault state, and on the reliability of the calculation steps, the main wiring system of the special nature of their reliability to make the necessary assumption, given the solution The general issue of such steps; Secondly, the main electrical wiring on the reliability of assessment of the mathematical model; further elaborated form of logic, analytical method and timing simulation of the main electrical wiring reliability of detailed steps, and its application in the main wiring Reliability of assessment. Finally, cited two examples of the main electric connection reliability analysis calculated.
Through this, we can plant and substation main wiring the reliability of a basic understanding of comparative reliability of these three methods, we find that they have their own characteristics and scope of application, within its scope of their Can achieve more accurate results.