German Marine Service&Consulting,Financing and trading GmbH
Each barge will have to demonstrate two complete cycles of loading and
un-loading aperations under the responsibility of builder / supplier's
Master/Engineers.
25 Documents and Drawings:
Brfore starting the split barge,complete set of as built drawing in 6 fold will be
delivered including following:-
- general arrangement plan
- main construction plans.
- safety plan
- docking plan
- main electric diagram
- main hydraulic diagram
- lubrication instruction
- instruction book/manual
- instruction and maintenance manuals of machinery
- list of inventory on board
- markers list
- sounding charts.
The required framed drawing,e.g.drawing,e.g. of the safetyplan,a tank
capacity plan and a fire lines plan will also be positioned where required.
All drawings and documentation will be in English language.
At the acceptance a full set of "as built"plans and a full documentation with spare
parts list for all installation fitted on board will be given(delivered in six plicate).